This document outlines a comprehensive methodology for conducting floor flatness (FF) and floor levelness (FL) testing in compliance with ASTM E1155. It details equipment considerations (specifically ZIPLEVEL), data collection protocols, analysis principles, common challenges, and documentation requirements.

1.0 Testing Methodology Overview

Figure 1: Key testing considerations including edge conditions, joint transitions, surface waviness, and measurement patterns.

1.1 Measurement Principles (ASTM E1155)

Floor flatness testing quantifies the uniformity of a concrete slab surface using two primary F-numbers:

  • FF (Floor Flatness): Relates to the “bumpiness” of the floor. It is derived from the change in elevation over a 1-foot (305 mm) distance, measured along multiple sample lines. Higher FF numbers indicate a flatter, smoother floor with smaller bumps.
  • FL (Floor Levelness): Relates to the floor’s conformity to the intended horizontal plane. It is derived from the change in elevation over a 10-foot (3048 mm) distance along multiple sample lines. Higher FL numbers indicate a more level floor, closer to the specified design elevation across the measured section.

1.2 Equipment Specifications

Accurate point elevation measurements are crucial. While various instruments can be used, devices like the ZIPLEVEL PRO-2000 are common due to their precision.

Example: ZIPLEVEL PRO-2000 Technical Parameters:

  • Vertical Range: ±40 feet (approx. 12 meters)
  • Precision: Capable of sub-millimeter accuracy under stable conditions.
  • Measurement Units: Selectable (Metric/Imperial).
  • Calibration: Requires periodic verification using integrated CAL function or against a known reference.

2.0 Data Collection Protocol (ASTM E1155)

2.1 Measurement Sample Line Layout

ASTM E1155 specifies collecting elevation differences along defined measurement lines within test sections. Key parameters include:

  • Test Section Size: Sufficiently large to be representative (e.g., minimum area or number of placements).
  • Sample Line Placement: Lines should be distributed across the test section, often parallel to slab edges and at angles.
  • Minimum Sample Points: A minimum number of elevation difference readings (dz for FF, dZ for FL) are required per test section based on its area (e.g., ASTM recommends at least 34 readings for every 1000 sq ft).
  • Edge Distance: Measurements typically start and end a minimum distance from slab edges or construction joints (e.g., 1-2 feet or 0.5 meters).
  • Testing Window: Testing is ideally performed as soon as the concrete can bear foot traffic without damage, typically within 72 hours of placement, before significant curling or deflection occurs.

2.2 Raw Data Collection (Point Elevations)

Instruments like the ZIPLEVEL record point elevations relative to a starting benchmark. These point elevations are the raw data used to calculate the required elevation differences (dz and dZ) for FF and FL calculations.

Example: Point Elevation Grid (Illustrative – Not ASTM Sample Lines)

Below is an example of point elevation readings (in mm, relative to a benchmark) on a hypothetical 1-meter grid. Note: Actual ASTM data collection follows specific sample lines, not necessarily a uniform grid.

Grid Point (X, Y meters) | Elevation (mm)
————————-|—————–
(0, 0)                   | 999.50
(1, 0)                   | 998.62
(2, 0)                   | 998.08
(3, 0)                   | 998.73
(4, 0)                   | 1000.45
(0, 1)                   | 1001.80
(1, 1)                   | 998.23
(2, 1)                   | 1001.88
(3, 1)                   | 999.22
(4, 1)                   | 998.56
… and so on for all measured points …

From these point elevations along defined sample lines, the successive 1-ft elevation differences (dz) and 10-ft elevation differences (dZ) would be calculated.

3.0 Testing Process

3.1 Equipment Preparation & Calibration

  1. Setup: Acclimatize equipment (e.g., ZIPLEVEL) to ambient temperature.
  2. Power On & Zero: Turn on the unit, allow stabilization, and establish a zero reference or benchmark elevation.
  3. Calibration Check: Verify instrument accuracy against a known reference (e.g., using the unipod for a fixed height check, ensuring it reads within tolerance like ±1mm for a 1219mm check). Perform internal calibration (CAL function) if necessary, following manufacturer instructions. Document calibration checks.

3.2 Measurement Protocol

  1. Layout Phase:
  • Define and mark test section boundaries.
  • Lay out measurement sample lines according to ASTM E1155 requirements.
  • Establish instrument benchmark/reference point(s).
  • Document site conditions (temperature, humidity, slab age, etc.).
  1. Data Collection Phase:
  • Place the measurement module precisely at each required point along the sample lines (typically at 1-foot intervals).
  • Allow reading to stabilize before recording the elevation.
  • Carefully manage instrument base unit position and cord/tubing to avoid measurement errors.
  • Systematically record all elevation readings with corresponding locations.
  1. Quality Control Phase:
  • Perform spot checks or re-measure a percentage of points (e.g., 5%) to verify repeatability.
  • Review data for anomalies or outliers during collection.
  • Document any unusual conditions encountered (cracks, joints, debris, etc.).

4.0 Data Analysis (ASTM E1155)

4.1 Calculation of FF and FL

The core of the analysis involves calculating FF and FL from the collected elevation differences along the sample lines:

  1. Calculate dz: Determine the difference in elevation between points spaced 1 foot (305 mm) apart along each sample line.
  2. Calculate dZ: Determine the difference in elevation between points spaced 10 feet (3048 mm) apart along each sample line.
  3. Statistical Analysis: Apply the statistical formulas defined in ASTM E1155 to the sets of dz and dZ values for the test section. This involves calculating standard deviations and means to arrive at the final FF and FL numbers for that section.
  • Based on the example point elevation data, after calculating the required dz and dZ values along defined sample lines, the standard deviations and means would be computed to yield the FF and FL numbers.

4.2 FF/FL Classification Reference

FF and FL numbers provide a standardized way to classify floor flatness and levelness. Higher numbers indicate flatter and more level floors. (Note: Project specifications dictate required F-numbers).

ClassificationTypical FF ValueTypical FL ValueCommon Use Cases
Conventional2015Basic slabs, non-critical areas
Moderately Flat2520Carpeted areas, standard office space
Flat3525Thin-set tile, VCT, LVT, warehouses w/ moderate traffic
Very Flat4535Air-pallet use, ice rinks, sensitive finishes
Super Flat60+40+High-bay warehouses (narrow aisle AGVs), TV studios

5.0 Common Challenges and Solutions

5.1 Edge Effects / Walls

  • Challenge: Slab edges and walls restrict measurement lines and can exhibit curling.
  • Solution: Follow ASTM guidance on minimum distance (e.g., start/end lines 1-2 ft from boundaries). Document edge conditions. Use appropriate statistical methods if edge data must be included/excluded per project specs.

5.2 Construction Joints & Cracks

  • Challenge: Joints and cracks represent discontinuities that can affect readings.
  • Solution: Measure up to but not directly on joints/cracks unless specifically required. Document their location relative to measurement lines. Additional measurements near joints may be specified.

5.3 Surface Waviness / Irregularities

  • Challenge: Consistent waves or localized high/low spots can skew results if not properly sampled.
  • Solution: Ensure sufficient sample line coverage across the test section. Document observed patterns. Advanced analysis can sometimes identify wavelength issues, although FF/FL primarily addresses shorter/longer interval variations.

6.0 Documentation Requirements

6.1 Test Report Components (Essential)

  1. Project Information: Project name, location, date, testing personnel.
  2. Test Area Identification: Clear description and/or drawing of the test section(s).
  3. Equipment Information: Instrument type, serial number, calibration verification date/record.
  4. Raw Data: Recorded point elevations or elevation differences (dz, dZ) linked to locations.
  5. Calculations: Summary of statistical analysis performed according to ASTM E1155.
  6. Results: Calculated FF and FL numbers for each test section.
  7. Observations: Notes on environmental conditions, slab age, surface conditions, joints, anomalies, etc.
  8. Compliance Statement: Statement regarding compliance (or non-conformance) with specified FF/FL requirements.

6.2 Quality Assurance Records

  • Maintain logs of equipment calibration checks.
  • Document personnel training/certification if required.
  • Retain field notes and raw data logs.

7.0 Conclusion

Accurate floor flatness and levelness testing according to ASTM E1155 requires meticulous adherence to methodology, proper equipment use and calibration, systematic data collection, and correct statistical analysis. This technical overview provides a framework for technical teams to perform reliable FF/FL testing, ensuring quality control, compliance with specifications, and valuable documentation for construction projects.

Always refer to the latest version of ASTM E1155 for complete, authoritative details. For specific equipment operation and calibration, consult the manufacturer’s documentation.